22/03/2021 - 28/02/2021
- 
    Wo Tian - 
        Prepared agendas and pitches for meetings and tutorial 
- 
        Hosted internal and external meetings 
- 
        Added the approaches for risks that were pointed out 
- 
        Planned audit 2 presentation structure 
- 
        General communication with all stakeholders, including extra meeting hours with the clients and reach out to IT department of RSPhys 
 
- 
        
- 
    Tian Wu - 
        Team meeting with client on discussing the following: 
- 
        Detailed dropdown options and layout on the website 
- 
        Modification of SOW 
- 
        Tutorial conversation with tutor on: - 
            Project management 
- 
            Audit 2 requirements 
 
- 
            
- 
        Preparation for audit 2 by: - 
            Drafting Keynote powerpoint 
- 
            Minor changes of contents across multiple Confluence pages 
 
- 
            
 
- 
        
- 
    Ruoqian Wu - 
        Participated in team meetings with client and group member 
- 
        Participated in website interface design 
- 
        Edited the Statement of Work 
- 
        Created and drafted the project status page 
 
- 
        
- 
    Yaoyi Xu - 
        Participated in team meetings with client and group member 
- 
        Participated in website interface design 
- 
        Edited the Statement of Work 
- 
        Created and drafted the project status page 
 
- 
        
- 
    Hengrui Xu - 
        Participated in team meetings with client and group member 
- 
        Participated in website front end design 
- 
        Created website prototype 
 
- 
        
- 
    Ruiqiao Jiang - 
        Preparation for audit 2 by: - Drafting the PowerPoint
 
- 
        Recorded the detailed Meeting Minutes with clients 
- 
        Optimized the web design prototype on the service type and the substrate type 
- 
        Added the sub-page for the meeting minutes to show the specific discussion of our meetings. 
- 
        Meeting with teammates on optimizing the prototye, optimizing the Powerpoint and the presentation. 
- 
        Updated the role in Team Charter 
 
- 
        
- 
    Guoyu Wang - 
        Participated in team meetings with client and group member 
- 
        Participated in website design 
- 
        Added website prototype for new requirements include: - 
            Photonics coating 
- 
            SPDT part 
 
- 
            
 
- 
        
 
       TechLauncher
 TechLauncher