22/03/2021 - 28/02/2021
-
Wo Tian
-
Prepared agendas and pitches for meetings and tutorial
-
Hosted internal and external meetings
-
Added the approaches for risks that were pointed out
-
Planned audit 2 presentation structure
-
General communication with all stakeholders, including extra meeting hours with the clients and reach out to IT department of RSPhys
-
-
Tian Wu
-
Team meeting with client on discussing the following:
-
Detailed dropdown options and layout on the website
-
Modification of SOW
-
Tutorial conversation with tutor on:
-
Project management
-
Audit 2 requirements
-
-
Preparation for audit 2 by:
-
Drafting Keynote powerpoint
-
Minor changes of contents across multiple Confluence pages
-
-
-
Ruoqian Wu
-
Participated in team meetings with client and group member
-
Participated in website interface design
-
Edited the Statement of Work
-
Created and drafted the project status page
-
-
Yaoyi Xu
-
Participated in team meetings with client and group member
-
Participated in website interface design
-
Edited the Statement of Work
-
Created and drafted the project status page
-
-
Hengrui Xu
-
Participated in team meetings with client and group member
-
Participated in website front end design
-
Created website prototype
-
-
Ruiqiao Jiang
-
Preparation for audit 2 by:
- Drafting the PowerPoint
-
Recorded the detailed Meeting Minutes with clients
-
Optimized the web design prototype on the service type and the substrate type
-
Added the sub-page for the meeting minutes to show the specific discussion of our meetings.
-
Meeting with teammates on optimizing the prototye, optimizing the Powerpoint and the presentation.
-
Updated the role in Team Charter
-
-
Guoyu Wang
-
Participated in team meetings with client and group member
-
Participated in website design
-
Added website prototype for new requirements include:
-
Photonics coating
-
SPDT part
-
-